You paid, and now your supplier will not reply. Before you assume fraud, check whether it is a delay — then build your evidence file, send one written demand, and escalate through the platform that holds your money. A quiet supplier is often not a fraudster: they may be embarrassed, cash-strapped, or drowning in a factory problem they cannot admit.
Silence usually creeps in: messages get slower, a ship date slips one week, then two, the photos stop coming.
First, check whether it is silence or a delay
Not every quiet supplier is ghosting you: festivals, holidays and time-zone gaps can stretch a normal 24-hour reply into 2–3 days. Check two things before you escalate:
- Message status. Is your message marked "read" with no reply for 48 hours or more, or still unread?
- The listing. Is it still active, and is the store still answering other buyers? A store dark for everyone is a different problem from one ignoring you.
If it is a genuine delay, send one low-pressure follow-up asking for the shipping status. One message, one question, no threats.
The first 48 hours: build the file
If the silence is real, stop messaging and start documenting. Calm, dated, complete — that file wins a dispute, and it gets weaker every day you wait. Gather these into one folder:
- The purchase order, with quantities, specs, tolerances, ship dates and penalties.
- The approved sample record and the spec sheet you both agreed on.
- The inspection report, if one exists, plus carton and dated arrival photos.
- The invoice, the payment receipt, and the full chat history.
Screenshot the full chat thread now, while the messages are still there. Keep further communication on the platform — private email or chat apps weaken your record.
Send one written demand
Next, put it in writing. Not a rant — a demand: the order number, the specific failure, what you want (refund, replacement, or rework), and a firm deadline, referencing the contract clause breached. Send it through the platform's messaging and by email too, asking for a reply by a named date.
Keep it short: "Order #1234, 500 units, ship date October 20, no shipment and no reply since October 18. Under clause 4, please confirm shipment by October 28 or refund the 30% deposit of $2,400."
Escalate through the platform
If you bought under Alibaba Trade Assurance, this is your strongest and cheapest lever — but it only exists if you paid through the platform. Wire cash to a personal bank account and you are on your own. Trade Assurance holds your payment and refunds you if the order is not shipped, arrives defective, or misses the contract terms, and you can request a refund within 30 days of delivery.
| Step | What happens | Timing |
|---|---|---|
| Open the dispute | Upload your evidence file from the order details page | Within 30 days of delivery |
| Supplier response | The supplier has 3 days to respond to your claim | 3 days |
| Automatic escalation | If either side goes quiet for 7 days, Alibaba escalates and rules on the evidence | 7 days of silence |
On AliExpress the numbers differ but the logic is the same: buyer protection covers up to 60 days for standard deliveries, and refund requests can be submitted up to 15 days after the order is marked complete.
If the order was paid outside the platform, use the platform's complaint process, gather the same evidence file, and contact your bank or payment provider at once if fraud is suspected. If your contract names arbitration, the usual forum is the China International Economic and Trade Arbitration Commission (CIETAC).
Prevention for the next order
Almost every recoverable dispute traces back to two documents: a clear written contract, and a payment method that keeps your money in escrow until the goods are right.
- Pay through the platform. Trade Assurance or its equivalent is the only protection that works without a lawyer.
- Tie payment to quality events. Standard terms are 30% deposit and 70% before shipment — but tie that 70% to a passed inspection, not to a calendar date. See our first-order sizing guide and AQL sampling guide for how to set the inspection up.
- Keep a backup supplier warm. A second source turns a silent supplier from a crisis into a phone call. Get a quote and a sample from the backup before you need them.
- Write the contract before the deposit. Quantities, specs, tolerances, ship dates, penalties, and the governing law if things break down.
Featured model: the ET580
The ET580 smartwatch is the kind of order this guide is written for: a straightforward model — a 2.04-inch AMOLED display (368×448) with Bluetooth 5.2 calling, a 380mAh battery with 3–5 days of use and 20+ days of standby, IP68 waterproofing, and magnetic charging in about 3–4 hours, running the H Band app. Every number there comes from the spec sheet.

The point is not the watch: even a simple order like this one needs the same paper trail — an agreed spec sheet, an approved sample, an inspection tied to payment, and all of it on the platform. See our smartwatch sourcing guide for the full checklist.
Frequently Asked Questions
My supplier stopped replying after I paid the deposit. Is it fraud?
Not necessarily. Silence usually means one of three things: a festival or holiday delay, a factory problem the supplier is embarrassed to admit, or cash trouble. Check whether your message was read and ignored for 48 hours or more, whether the listing is still active, and whether a holiday explains it. If the silence is real, build your evidence file, send one written demand with a named deadline, and escalate through the platform.
How long do I have to open a Trade Assurance dispute?
You can request a refund within 30 days of delivery when shipping time or quality fails the contract. Once you open the formal dispute, the supplier has 3 days to respond, and if either side goes quiet for 7 days Alibaba escalates automatically and rules on the evidence. On AliExpress the window is different: buyer protection covers up to 60 days for standard deliveries, and refund requests can be submitted up to 15 days after the order is marked complete.
I paid by wire transfer outside Alibaba. What can I do now?
Your options are much weaker, because Trade Assurance only protects payments made through the platform. Gather the same evidence file — purchase order, agreed spec sheet, payment receipt and full chat history — and use Alibaba's complaint process for offline orders. Contact your bank or payment provider at once if you suspect fraud. For the next order, pay through the platform and tie the final payment to a passed inspection, so the money stays protected until the goods are right.





