Projector OEM from China means your logo on the housing, your logo on the boot screen, and your box and manual — without changing the projector inside. Logo-only orders start at 100-300 units and full private-label packaging at 300-500, per published maker ranges. The HY300 runs Android 11, so the boot screen and system language are the parts often customized.
What OEM actually covers on a projector
OEM on a projector is more than printing a logo on the housing: each item has its own minimum order and its own approval step. Ask the supplier to confirm which items are available for your selected model and what MOQ applies to each one.
| Customization item | What changes | Confirm before you pay |
|---|---|---|
| Housing logo | Printed or engraved logo on the body | Artwork position, size, surface effect |
| Boot screen logo | Logo shown at startup | Logo file, background style, display ratio, firmware support by model |
| Private label color box | Your box, barcode, SKU label | Print proof, carton marks, box strength |
| Manual and warranty card | Language, your brand, local wording | Translation quality, compliance wording |
| Plug and adapter | Plug type for your market | Included in the box, certified for the destination |
| System language | Menu and UI language | Available languages for this model |
| Firmware | Selected settings by model | Version number that will ship on your units |
The boot screen: a small change with a big first impression
The boot screen is the first thing your buyer sees at startup, and the customization buyers most often misunderstand. A housing logo is checked through artwork position, size and surface effect. A boot screen logo depends on the projector system, firmware condition, display ratio and technical support of the selected model.
The supplier needs a clear logo file, your preferred background style, the display ratio, your target market, the model, and the quantity. Confirm the boot screen together with the specs, housing logo, manual language and packaging artwork. Do not confirm a boot screen change before checking the actual model, the system version, and the sample display effect.
Boot screen samples take longer: one maker’s published guide puts standard samples at 3-7 working days and logo or boot screen samples at 7-12 working days, depending on model availability, artwork confirmation and technical arrangement.
Packaging: the box your buyer judges first
Packaging matters because a projector holds electronic parts and a lens. Two choices cover most orders: a private label color box printed with your brand, or a neutral box. Online retail usually needs the private label box, with barcode and SKU labels the marketplace can scan.
Ask for the print proof of the box, the barcode label and the carton mark before production starts, and check the manual language — a manual in the wrong language is a support ticket on day one.
MOQ and lead time: read the ranges, then get yours in writing
Published ranges differ by maker, so treat them as a map, not a quote. Your figure depends on your model, your artwork, and your quantity — ask for it in writing on your order.
| Tier | Typical published range | What it buys |
|---|---|---|
| Logo only | 100-300 units | Housing logo; one maker quotes white-label silk-screen printing from 300-500 units |
| Private label packaging | 300-500 units | Color box, barcode label, manual, carton mark |
| Full custom branding | From 1,000 units | Custom housing colors, branded boot logo, modified Android launcher, gift box packaging |
| Full ODM custom mold | From 3,000 units | New mold and new housing, built to your design |
One maker’s guide puts mass production at 20-30 days for standard orders after deposit and sample approval, and 25-35 days for OEM packaging or branding orders. Another maker quotes 45-60 days for first OEM orders, and 30-45 days for repeat OEM orders.
The sample that locks it down
Sample confirmation is one of the most important steps in an OEM projector order. The sample lets you check appearance, image quality, menu operation, accessories, packaging and logo effect before production starts. For logo, boot screen or packaging samples, more time is needed because artwork and technical settings must be confirmed.
Put the approval in writing before deposit, bulk production and final packing. Approve the logo, the boot screen and the box together, on one sample, and keep that sample as the reference. When the bulk goods arrive, compare them against the approved sample — appearance, menu, logo, box — before you pay the balance.
Featured model: the HY300
The HY300 LCD smart projector states 120 ANSI lumens on a native 1280×720 panel, with Android 11, dual-band Wi-Fi 6 and Bluetooth 5.0. It carries one USB port, one HDMI port and one audio jack, a single 3W speaker, and fan noise under 25 dB. Its throw ratio is 1.37, keystone correction is manual, the bulb life on the sheet is 50,000 hours, and it boots in 3 seconds. It weighs 0.8 kg and projects 40-130 inches from 1.2-4 metres. HDMI is listed as optional on the sheet, so confirm in writing whether your units ship with HDMI IN, HDMI OUT, or both. See our projectors page for the full HnThai projector range, and our mini projector buying guide for choosing between models.

Frequently Asked Questions
What files does the supplier need for my logo?
Send a vector logo file — AI, EPS or SVG — or a high-resolution PNG with a transparent background, plus your preferred background style, the display ratio, and your target market. The supplier also needs the model and the quantity before it can confirm a boot screen sample. Send the original artwork file, not a screenshot — a low-resolution web logo prints soft on the housing and pixelated on the boot screen. Tell the supplier the boot screen display ratio up front: a logo drawn for a wide screen crops badly on a square one.
Can I change the boot screen on a small order?
It depends on the model and the quantity. One projector maker’s guide puts logo customization at 100-300 units for selected models, but boot screen support varies by model, system version and firmware — some models support it, some do not. Confirm the boot screen together with the housing logo and packaging artwork, and check the sample display effect before you approve. If your model does not support a custom boot screen, the housing logo and the color box still carry your brand.
How long does an OEM projector order take?
Standard mass production usually takes 20-30 days after deposit and sample approval, and OEM packaging or branding orders usually take 25-35 days, per one maker’s published guide. First OEM orders at another maker take 45-60 days, with repeat orders at 30-45 days. Add 7-12 working days for a boot screen sample before production starts. The clock starts after deposit and sample approval, not after your first email — artwork rounds and sample shipping sit outside the factory’s production days. Get the lead time for your model and your artwork in writing.





