• 9 projector models in one catalog — home theater, portable, and mini projectors, from 480P to native 1080P
  • 6 models already live on our product site with full specs and photos, more added as new stock arrives
  • LCD models with WiFi, Bluetooth, and Android apps on selected models
  • Every projector powered on and tested before shipment — image, sound, WiFi, and remote checked
  • OEM/ODM available: logo, packaging, and color options vary by model
  • Samples available — you cover the sample and shipping cost
  • Quote within 24 hours with price, lead time, and practical suggestions

Projector Sourcing from China

Projector listings hide the numbers that matter — real brightness, real resolution, and whether the “4K support” label means anything. This page lists our projector models with the specs buyers check first, so you can compare before you ask for a quote.

Wholesalers, distributors, dealers, traders, and agents are welcome to buy in bulk. Tell us the models and quantities you need, and we reply within 24 hours with a quote. Pricing varies by model, specs, and order size — send your list for an exact quote.

What Are Smart Projectors?

A smart projector is a compact LCD projector with built-in WiFi, Bluetooth, and — on many models — an Android system with apps, so it can stream video without a separate player. Home theater models are built for a living room or a bedroom wall; portable and mini models are built to move — small enough to carry to a meeting room, a classroom, or a backyard movie night.

Buyers usually choose on three things: native resolution, brightness, and size. A mini projector fits a bag; a home theater model fills a wall. Both need a dark enough room to look their best.

IMPORTANT: two numbers on a projector listing need reading twice — resolution and brightness. “Supports 4K” means the projector accepts a 4K signal; the native resolution is what it actually displays. And brightness figures vary by how they are measured — ANSI lumens is the figure you can compare across models. Ask us for the native resolution and the ANSI lumens figure for any model before you order.

Why Choose Our Projectors?

  1. Home theater and portable in one catalog. From the HY300 home theater range to the HY320 Mini and YG300 Mini portables — you can cover living-room buyers and on-the-go buyers from one order.
  2. Real resolution figures. We state native resolution where the spec sheet gives it, and we say so when a figure is a “supported” resolution rather than a native one.
  3. Tested piece by piece. Every projector is powered on, focused, and checked — image, sound, WiFi, Bluetooth, and remote — before it ships.
  4. OEM/ODM available. Logo printing, custom packaging, and color options vary by model. Send your logo and target quantity and we confirm what is possible.
  5. Samples before bulk. Order a sample of the exact model you plan to stock, test the picture in your own room, then place the bulk order.
  6. More models coming. We add new projector models as stock arrives. If you need a brightness or resolution we do not list yet, send us your specs and we check the catalog for you.

Application

  • Home theater retail — HY300 and HY300 Pro models for living-room and bedroom setups
  • E-commerce resale — mini and portable projectors are the types that sell first online
  • Education and offices — portable projectors for classrooms and meeting rooms
  • KTV and entertainment venues — the HY300 Pro KTV for karaoke and party rooms
  • Outdoor and camping — compact models for backyard movie nights
  • Gifts and bundles — mini projectors with gift packaging for holiday and event sales

Models by Series

Home Theater

HY300 projector

HY300

LCD smart projector, WiFi 6, 4K video decoding

HY300 Pro projector

HY300 Pro

Home theater projector

HY300 Pro KTV projector

HY300 Pro KTV

KTV home theater projector

HY260PRO projector

HY260PRO

LCD home smart projector

Portable & Mini

HY320 Mini projector

HY320 Mini

Portable smart projector, native 720P, auto keystone, WiFi 6

YG300 Mini

Mini projector, supports 1080P

K6 Wireless

Wireless projector, Android apps

LCD Projectors

HY320 projector

HY320

1080P LCD projector

CY303

480P, 100 ANSI lumens

More models are added to our product site as new stock arrives. If you need a brightness, resolution, or feature that is not in the list above, send us your specs and we check the catalog for you.

Related Accessories

We can source these with your projector order — ask us to add them to your quote:

  • Projector screens (portable and fixed)
  • Ceiling mounts and brackets
  • HDMI cables and adapters
  • Spare remotes
  • Carrying cases for portable models
  • External speakers for home theater setups

Our Inspection Process

We inspect every piece, not a sample. Each projector goes through 5 checks before it ships:

  1. Visual check — body, lens, and finish checked for scratches and defects
  2. Power-on and image test — the projector powers on, focuses, and shows a clear image; keystone and dead pixels checked
  3. Sound and connectivity test — built-in speaker, WiFi, Bluetooth, and HDMI inputs tested on the models that have them
  4. Remote and accessories check — remote, power adapter, and cables matched against the packing list
  5. Packing check — box contents matched against the packing list; logo and printing checked on OEM orders

Units that fail any check are set aside and replaced before shipment.

Why Wholesale From HnThai

  1. 300+ models in one catalog — projectors, smart wearables, and trending electronics from a single supplier, so you can build a full consumer electronics line in one order
  2. 10+ years in Huaqiangbei — we know the market, the factories, and the price levels, and we check new models in person before we list them
  3. 1-by-1 inspection — every piece tested before shipment, not a sample check
  4. OEM/ODM available — logo, packaging, and color options vary by model
  5. Samples before bulk — test the exact model in your own room before you commit
  6. 24-hour quote reply — send your model list and quantities, and we reply within 24 hours with price, lead time, and practical suggestions

FAQ

What is the MOQ for projectors?

MOQ varies by model and by customization. Standard models can start at small trial quantities; OEM orders need a higher quantity. Send us the model and the quantity you have in mind, and we confirm the MOQ within 24 hours.

Can I get samples before a bulk order?

Yes. Samples are available for every model we list. You cover the sample and shipping cost. Tell us which models you want to test, and we confirm the sample price within 24 hours.

What is the difference between native resolution and supported resolution?

Native resolution is what the projector actually displays. Supported resolution is the highest signal it can accept — a projector can accept a 4K signal and still display it at 1080P or lower. Always check the native figure. Send us the models you are comparing and we give you the native resolution for each one.

How bright should a projector be?

It depends on the room. A darker room needs less brightness; a bright living room needs more. Compare models by their ANSI lumens figure, not by marketing “lumens” numbers. Tell us where your customers will use the projector, and we recommend the right brightness.

Do your projectors run Android?

Some models run an Android system with apps; others need an external player or a phone connection. The system varies by model. Send us the models you are comparing and we confirm the system for each one before you order.

What comes in the box?

Box contents vary by model — usually the projector, a remote, and a power adapter. Screens, mounts, and cables are usually sold separately. We confirm the exact box contents for each model in the quotation.

Can you put my logo on the projector and the packaging?

Yes, OEM is available on most models: logo printing on the packaging, and color options on the projector body. What is possible depends on the model and the quantity. Send your logo and the model list, and we confirm the options within 24 hours.

How long does delivery take?

Lead time depends on the model, the quantity, and whether you need OEM work. We confirm the exact lead time in the quotation. If you have a deadline, tell us the date when you send your inquiry.

Get a Quick Quote

Send us the models and quantities you need. We reply within 24 hours with price, lead time, and practical suggestions.

Get a Free Quote

Related Categories

Submit Inquiry

Tell us what kind of product you want to import from China. We will contact you within 1 working day, please pay attention to the email with the suffix “@hnthai.com”.