Send your supplier a vector logo file — AI, EPS or PDF with fonts outlined — plus a placement sheet naming the part, size in millimetres and colour, and approve a digital proof before production starts. A website JPG prints soft at watch-dial size, and a rushed proof approval is the most common reason a logo order comes back wrong.
Vector or raster: the file that decides print quality
A vector file is built from paths and curves, so it prints sharp at any size — on a watch dial, a gift box or a banner. A raster file is built from pixels, so it prints sharp only at the size it was made for, and turns soft or blocky when blown up. That difference decides how your logo prints.
Send a vector file when you have one — AI, EPS or PDF saved from a design program. If you only have a JPG or PNG, send the largest version you have — 300 DPI at the printed size is the safe standard — and ask the supplier to redraw it as a vector. A complex illustration or hand-drawn mark can carry a quoted art fee, so ask before you assume a redraw is free.
One trap: a file extension does not prove a logo is vector. A PNG pasted inside an AI or PDF file is still a raster image — zoom in on the edge of a letter, and a vector edge stays smooth at any zoom while a raster edge breaks into small squares. Ask whoever designed the logo for the master vector file; that one request saves a round of remakes.
| File | Type | How a supplier uses it |
|---|---|---|
| AI | Vector | Best — editable source, placed straight on the template |
| EPS | Vector | Best — vector exchange format, any Illustrator version |
| Vector or raster | Good if the artwork inside is vector; check before sending | |
| PNG | Raster | Works if 300 DPI at the printed size, with a transparent background |
| JPG | Raster | Reference only — compression marks show up in print |
What to send: the artwork package
One file is not a package — send all five with the first message and cut a week of back-and-forth out of the order.
First, the production file: the vector AI, EPS or PDF, with every font converted to outlines and every linked image embedded. Outlined fonts stop the supplier's computer swapping your typeface; embedded images stop a missing link turning your mark into an empty box.
Second, a viewable reference: a PDF or JPG that shows what the finished logo should look like. The factory floor opens the reference, not the AI file, to check the look.
Third, a placement sheet: one page per branded part, with a drawing or a photo of the product, the logo drawn where it goes, and the size in millimetres. Name the part — dial, case back, strap buckle, gift box lid — and give a reference point, such as the centre of the dial or 5 mm above the box edge.
Fourth, a colour reference: Pantone (PMS) codes when the exact shade matters, or a printed sample the supplier can match against. "Our blue" is not a colour. A screen shows colour in light; print and engraving show it in ink and metal.
Fifth, a version note: the file name, the date and the status — for review, for sampling, or approved for production. Name files so the version is plain: logo_v3_2026-11-19.ai beats logo_final_FINAL.ai, which every buyer has sent at least once. When a file changes, say so in the message, so the factory never prints v2 after you approved v3.
Placement: agree millimetres, not "on the front"
"Put it on the front" has started more disputes than any other sentence in a logo order. The front of a watch has a dial, a bezel, a case side and a strap — four different parts, four different print methods, four different sizes.
Size matters most on small parts. A watch dial leaves room for a mark of about 8–12 mm wide, and at that size a tagline under the logo turns to mush. Simplify the mark for small placements: drop the tagline, drop thin lines, and test it at true size on the proof before you approve. For fine detail, ask for a laser-engraved sample first — engraving holds fine lines better than pad printing on a curved case.
Treat each placement as its own job. A full-colour logo on the gift box and a one-colour mark on the case back are two designs, two proofs and sometimes two prices. Tell the supplier which file goes where, so nothing is guessed. Check the proof at true scale, and judge whether a customer can read it at arm's length.
Colour: Pantone, not "our blue"
Colour is where a logo order most often drifts from what the buyer pictured. Laser engraving has no colour at all — it burns a mark into metal, and the result is the colour of the metal underneath.
Give Pantone codes when the shade is part of the brand. One published artwork guide lists PMS matching at $40 per colour, so expect a line item for it rather than a surprise on the invoice. If the order is one colour, say which one — a supplier who quotes one colour and prints four will charge the difference later.
A white logo on a black strap and a black logo on a white strap are two artwork versions, not one file used twice — send both, named clearly, or the supplier will pick one for you.
The proof: the last cheap chance to catch a mistake
Every logo order should include a free digital proof — a computer mockup of your product with the imprint in place — usually ready within 1–2 hours. Production starts once you approve it, so the proof is the last cheap chance to catch a mistake.
Check six things, in this order: the spelling of every word, including names, phone numbers, website and email; the imprint colour against the Pantone code you sent; the logo placement and size against your placement sheet; the product colour and quantity; the size or colour breakdown across the order; and the file version named on the proof. The supplier copies what you sent, so a typo in your file becomes a typo on 500 boxes.
Keep file acceptance and production approval as two separate steps. File acceptance means the artwork opens correctly and holds the assets the factory needs. Production approval means you have seen the proof at true scale, checked it against the placement sheet, and agreed in writing that this revision goes to production. For large or colour-critical orders, ask for a physical pre-production sample with your imprint before the full run. Our guide to testing smartwatch samples runs through the checks to put on that sample once it lands.
Featured model: the GT100PRO
The GT100PRO smartwatch is a good first custom-logo candidate because the product itself needs no changes: a Realtek 8763EWE chip, a 1.46-inch full-touch display at 360×360, Bluetooth 4.0/5.2, a 360mAh watch battery with 30mAh earbuds docked in the case, IP67, and 128MB of flash memory, at $32.50–$36.50. The watch case takes laser engraving or printing, and the gift box takes your artwork.
Confirm earbud playtime in writing first — it is not on the spec sheet — and check the IP67 rating covers the earbud compartment, since a lid is a weak point in the seal. See our 2-in-1 buying guide for both checks, and our Smartwatch Sourcing Guide for the full order checklist. Browse the smartwatches range and the full range.

Frequently Asked Questions
What file format should I send my supplier for a custom logo?
Send a vector file — AI, EPS or a PDF saved from a design program — with fonts outlined and images embedded. A vector logo prints sharp at any size, from a watch dial to a gift box. If you only have a JPG or PNG, send the largest version you have at 300 DPI or higher at the printed size, and ask the supplier to redraw it as a vector.
How do I check a logo proof before approving it?
Check spelling first — every word, phone number, website and email — then the imprint colour against your Pantone code, the placement and size against your placement sheet, and the product colour, quantity and file version. The proof shows the art at true scale on the product, so judge whether a customer can read it at arm's length.
My supplier says my logo file is too small. What now?
Go back to whoever designed the logo and ask for the master vector file in AI, EPS or PDF — that is the fix in most cases. A logo pulled from a website is made small and light for screens, often under 600 pixels wide, and it falls apart at print size. If none exists, ask the supplier to redraw it and approve the redraw on a proof before production.





