- Smart earphones for retail and e-commerce — a new range, with more models being added
- 3 models in our catalog so far: E12, E68, and E900
- Every earphone tested before shipment — sound, pairing, and charging checked
- OEM/ODM available: logo, packaging, and color options vary by model
- Samples available — you cover the sample and shipping cost
- Pairs with our smartwatch and smart ring range for bundle offers
- Quote within 24 hours with price, lead time, and practical suggestions
Smart Earphone Sourcing from China
Wholesalers, distributors, dealers, traders, and agents are welcome to buy in bulk. Tell us the models and quantities you need, and we reply within 24 hours with a quote. Pricing varies by model, specs, and order size — send your list for an exact quote.
What Are Smart Earphones?
Smart earphones are earphones with features beyond basic playback — touch controls, voice assistant support, app pairing, and noise handling, depending on the model. They sit in the same accessory shelf as phones, smartwatches, and tablets, and they sell well as bundle items: an earphone with a watch, or an earphone with a phone case, lifts the average order.
The differences that matter are simple: how they connect, how they charge, how long they play, and whether they work with your customers’ phones. Those details vary by model, so confirm them per model before you order.
IMPORTANT: always confirm compatibility before you order. Send us the phone models and systems your customers use, and we check each earphone model against them — an earphone that will not pair is a return, not a sale.
Why Choose Our Smart Earphones?
- A growing range, one supplier. E12, E68, and E900 today, with more models being added — and the same supplier behind our 300+ model wearables catalog.
- Tested piece by piece. Every earphone is powered on, paired, and checked — sound on both sides, charging, and controls — before it ships.
- Bundle-ready. Earphones pair naturally with our smartwatches and smart rings for bundle offers and gift sets.
- OEM/ODM available. Logo printing, custom packaging, and color options vary by model. Send your logo and target quantity and we confirm what is possible.
- Samples before bulk. Order a sample of the exact model you plan to stock, test the sound and the pairing with your own phone, then place the bulk order.
- More models coming. We add new earphone models as the range grows. If you need a type we do not list yet, send us your specs and we check the catalog for you.
Application
- E-commerce resale — earphones are light, easy to ship, and easy to bundle with phones and watches
- Phone accessories retail — earphones for phone shops and accessory counters
- Gifts and bundles — earphones as add-on gifts with watch and phone sales
- Distributors — earphones to round out a consumer electronics line
- Corporate gifts — earphones with custom logo and gift packaging
Models by Series
Smart Earphones
E12
Smart earphones — full specs on request
E68
Smart earphones — full specs on request
E900
Smart earphones — full specs on request
Note: the E900 earphones are a different product from the E900 smartwatch. If you need the watch, ask us for the E900 smartwatch instead.
More earphone models are added as the range grows. If you need a type that is not in the list above, send us your specs and we check the catalog for you.
Related Accessories
We can source these with your earphone order — ask us to add them to your quote:
- Spare ear tips in different sizes
- Charging cases
- Charging cables
- Carrying pouches
- Gift boxes and custom packaging
Our Inspection Process
We inspect every piece, not a sample. Each earphone goes through 5 checks before it ships:
- Visual check — earphone bodies, case, and finish checked for scratches and defects
- Power-on and pairing test — the earphones power on and pair with a phone
- Sound check — sound tested on both sides, and controls tested on the models that have them
- Battery and charging check — the earphones charge to full in the case or on the cable
- Packing check — box contents matched against the packing list; logo and printing checked on OEM orders
Units that fail any check are set aside and replaced before shipment.
Why Wholesale From HnThai
- 300+ models in one catalog — earphones, smart wearables, and trending electronics from a single supplier, so you can build a full consumer electronics line in one order
- 10+ years in Huaqiangbei — we know the market, the factories, and the price levels, and we check new models in person before we list them
- 1-by-1 inspection — every piece tested before shipment, not a sample check
- OEM/ODM available — logo, packaging, and color options vary by model
- Samples before bulk — test the exact model with your own phone before you commit
- 24-hour quote reply — send your model list and quantities, and we reply within 24 hours with price, lead time, and practical suggestions
FAQ
What is the MOQ for smart earphones?
MOQ varies by model and by customization. Standard models can start at small trial quantities; OEM orders need a higher quantity. Send us the model and the quantity you have in mind, and we confirm the MOQ within 24 hours.
Can I get samples before a bulk order?
Yes. Samples are available for every model we list. You cover the sample and shipping cost. Tell us which models you want to test, and we confirm the sample price within 24 hours.
What types of earphones do you carry?
Our current range covers smart earphones; the exact form factor varies by model. Send us the type you need and we confirm what matches, with full specs for each model.
Do the earphones work with iPhone and Android?
Compatibility varies by model. Send us the models you are comparing and the phone systems your customers use, and we confirm compatibility for each one before you order.
How long do the earphones play on one charge?
Play time and charging time vary by model. Send us the models you are comparing and we give you the rated figures for each one.
Can you put my logo on the earphones and the packaging?
Yes, OEM is available on most models: logo printing on the charging case and packaging, and color options on selected models. What is possible depends on the model and the quantity. Send your logo and the model list, and we confirm the options within 24 hours.
Can you source an earphone type that is not on this page?
Yes. Send us the specs — or a photo of the type you want — and we check the catalog and confirm what we can supply, with a quote within 24 hours.
How long does delivery take?
Lead time depends on the model, the quantity, and whether you need OEM work. We confirm the exact lead time in the quotation. If you have a deadline, tell us the date when you send your inquiry.
Get a Quick Quote
Send us the models and quantities you need. We reply within 24 hours with price, lead time, and practical suggestions.
Related Categories
- Smartwatches — 200 models with AMOLED, GPS, and Bluetooth calling
- AI Smart Glasses — 60 models with cameras, translation, and Bluetooth audio
- Smart Rings — 36 models with health tracking, touch screens and 5ATM waterproof
- Projectors — smart and home theater projectors, from mini to 1080P
- Stands & Holders — phone, tablet and laptop stands and mounts
- Promotional Gifts — gift-ready electronics with custom logo and packaging
- Other Hot Products — pocket watches and trending electronics