Trendy E-commerce Items

15% Cheaper than Alibaba

OEM/ODM Available

1 by 1 Quality Inspection

We Have Abundant Product Categories Ready for You

Want to find the latest and hottest consumer electronics products?

  • If so, just come to me. We are in the world’s largest electronics market.
  • We have the fastest information source and the best price.
  • Whether you want stock or customized products, we can offer them.

Mini Microphone

Professional Wireless Microphone
Portable Laptop Wireless Lavalier Microphones for Teaching Recording, Performances, conferences and presentations, etc.

Smart Power Bank

2.2-inch display screen.
Large capacity with built-in cables.
App intelligent power bank.
Intelligent Wearing+Bluetooth Audio+Power Bank Three in One.

Smart Mask

Ruishenger R11 Air Electric Mask, Wearable Air Purifiers.
Anti haze PM2.5 formaldehyde removal dust and pollen electric air supply. Compact and portable.

Magic Keyboard

Multi-gesture operation touchpad for iPad OS14.5 or the higher system.
Vertical screen support mode.
Magnetic absorption separation, All-inclusive design.

Wireless Mouse

New Transparent Wireless Bluetooth Mouse.
Type-c charging, Four DPI settings.
LED fully silent keys.
Fully magnetic design.

CO2 Detector

CO2 Carbon Dioxide Detector.
Air temperature and humidity monitoring.
CO2 concentration monitoring.
Small and portable, easy to carry.

Need Detailed Product Catalogs?

2 minutes to spare? We have prepared detailed catalogs for you.  Just fill in the form and tell us what products you want to import from China.