• 36 smart ring models in one catalog — health tracking, touch screens, ceramic builds, and 5ATM/IP68 waterproof options
  • 20 models already live on our product site with full specs and photos, more added every week
  • Screen and touch models for buyers who want a display; screen-free models for buyers who want a slim ring
  • Every ring inspected piece by piece before shipment — sensors, charging, and pairing tested
  • OEM/ODM available: logo, packaging, and color options vary by model
  • Samples available — you cover the sample and shipping cost
  • Quote within 24 hours with price, lead time, and practical suggestions

Smart Ring Sourcing from China

Smart rings look simple, but buyers get returns when sizing, battery life, or app compatibility goes wrong. This page lists the 36 models in our catalog by series and key specs, so you can check what fits your customers before you ask for a quote.

Wholesalers, distributors, dealers, traders, and agents are welcome to buy in bulk. Tell us the models and quantities you need, and we reply within 24 hours with a quote. Pricing varies by model, specs, and order size — send your list for an exact quote.

What Are Smart Rings?

A smart ring is a finger-worn tracker that records heart rate, sleep, activity, and — depending on the model — body temperature and ECG data. Most models have no screen: the data shows up in the companion app on the phone. A growing group of models adds a small touch screen or display to the ring itself.

Smart rings suit buyers who want health tracking without a watch on the wrist: light, small, and easy to wear day and night. They charge on a small dock or case, usually wirelessly.

IMPORTANT: sizing is the number one reason for ring returns. Always confirm the size chart for the model you order, and ask us about a sizing kit before you place a bulk order.

Why Choose Our Smart Rings?

  1. 36 models, one supplier. Health tracking rings, screen rings, ceramic rings, waterproof rings, and niche models like the prayer ring — you can cover several buyer groups from one order.
  2. Screen or screen-free. The R11C, SR16, and SY01 have touch screens or displays for buyers who want to see data on the finger. The rest stay slim and screen-free for buyers who want a plain ring.
  3. Waterproof options with real ratings. The R11 is rated 5ATM; the R20 and SR116 are rated IP68. Your customers can see the rating before they buy.
  4. Inspected piece by piece. Every ring is powered on, paired, and tested — sensors, charging, and app connection — before it ships.
  5. OEM/ODM without factory minimums on every model. Logo printing, custom packaging, and color options vary by model. Send your logo and target quantity and we confirm what is possible.
  6. Samples before bulk. Order a sample of the exact model you plan to stock, test the fit and the app with your own phone, then place the bulk order.

Application

  • Health and wellness retail — ECG, heart rate, sleep, and temperature tracking rings for wellness stores and pharmacies
  • Fitness channels — activity and sleep tracking rings for gyms and sports shops
  • E-commerce resale — screen rings and ceramic rings are the two types that sell first online
  • Gifts — ceramic and women’s models with gift packaging
  • Religious market — the R100 prayer ring for Muslim buyers
  • Corporate wellness programs — bulk rings for employee wellness packs

Models by Series

Health Tracking

R30 smart ring

R30

ECG monitoring

R08 smart ring

R08

Body temperature monitoring

R10M smart ring

R10M

Health tracking

SR08 smart ring

SR08

Health tracking

R99 smart ring

R99

Health tracking

Note: health tracking features record data for fitness and wellness use. They are not medical devices.

Screen & Touch

R11C smart ring

R11C

Touch screen

SR16 smart ring

SR16

Screen

SY01 smart ring

SY01

Display with touch

Waterproof & Ceramic

R11 smart ring

R11

5ATM waterproof

R12 smart ring

R12

Ceramic build

R20 smart ring

R20

Ceramic build, health tracking, IP68 waterproof

Everyday Bluetooth

R02 smart ring

R02

Bluetooth connection

R03 smart ring

R03

Bluetooth connection

R06 smart ring

R06

Bluetooth connection

R10 smart ring

R10

Wireless charging

Special Purpose

R100 smart ring

R100

Prayer ring

SR116 smart ring

SR116

AI recording, voice recording, AI translation, IP68 waterproof

R18 smart ring

R18

Women’s style

More models are added to our product site every week. If you need a feature or a price point that is not in the list above, send us your specs and we check the catalog for you.

Related Accessories

We can source these with your ring order — ask us to add them to your quote:

  • Charging docks and charging cases
  • Sizing kits (recommended before any bulk ring order)
  • Gift boxes and custom packaging

Our Inspection Process

We inspect every piece, not a sample. Each ring goes through 5 checks before it ships:

  1. Visual check — ring body, screen (on screen models), and finish checked for scratches and defects
  2. Power-on and pairing test — the ring powers on and pairs with the companion app
  3. Sensor test — heart rate, temperature, and ECG sensors tested on the models that have them
  4. Battery and charging check — the ring charges to full on its dock or case
  5. Packing check — box contents matched against the packing list; logo and printing checked on OEM orders

Units that fail any check are set aside and replaced before shipment.

Why Wholesale From HnThai

  1. 300+ models in one catalog — rings, watches, glasses, and bands from a single supplier, so you can build a full smart wearables line in one order
  2. 10+ years in Huaqiangbei — we know the market, the factories, and the price levels, and we check new models in person before we list them
  3. 1-by-1 inspection — every piece tested before shipment, not a sample check
  4. OEM/ODM available — logo, packaging, and color options vary by model
  5. Samples before bulk — test the exact model with your own phone before you commit
  6. 24-hour quote reply — send your model list and quantities, and we reply within 24 hours with price, lead time, and practical suggestions

FAQ

What is the MOQ for smart rings?

MOQ varies by model and by customization. Standard models can start at small trial quantities; OEM orders need a higher quantity. Send us the model and the quantity you have in mind, and we confirm the MOQ within 24 hours.

Can I get samples before a bulk order?

Yes. Samples are available for every model we list. You cover the sample and shipping cost. Tell us which models you want to test, and we confirm the sample price within 24 hours.

What sizes do the rings come in?

Ring sizes vary by model. We provide the size chart for each model before you order, and sizing kits are available on request. Confirm the sizes your customers wear before you place a bulk order — sizing is the top reason for ring returns.

Are the rings waterproof?

It depends on the model. The R11 is rated 5ATM, and the R20 and SR116 are rated IP68. Tell us how your customers will use the ring, and we recommend the right rating.

Do the rings work with iPhone and Android?

Most models pair with both iOS and Android through a companion app. The app name varies by model. Send us the models you are comparing, and we confirm the app for each one before you order.

How do the rings charge?

Most rings charge wirelessly on a small dock or case. Charging time and battery life vary by model. Send the models you are comparing and we give you the rated figures for each one.

Can you put my logo on the ring and the charging case?

Yes, OEM is available on most models: logo printing on the charging case and packaging, and color options on the ring. What is possible depends on the model and the quantity. Send your logo and the model list, and we confirm the options within 24 hours.

How long does delivery take?

Lead time depends on the model, the quantity, and whether you need OEM work. We confirm the exact lead time in the quotation. If you have a deadline, tell us the date when you send your inquiry.

Get a Quick Quote

Send us the models and quantities you need. We reply within 24 hours with price, lead time, and practical suggestions.

Get a Free Quote

Related Categories

  • Smartwatches — 200 models with AMOLED, GPS, and Bluetooth calling
  • AI Smart Glasses — 60 models with cameras, translation, and Bluetooth audio